Our company entered the Pakistan market in 1988.Since then, we have been continuously engaged in various infrastructure projects, mainly civil engineering works, such as the Kanpur Water Treatment Plant and the Kohat Tunnel, which were funded by the ODA of the Government of Japan. We also opened a Liaison Office in 2002.
Recently the National Highway N-70 Improvement Project in Pakistan was completed in 2019.
Year 2024 office closed
Indus highway Project
(N-55), Kohat tunnel
and Access Roads
Weather Forecasting
Center in Islamabad
Indus highway Project (N-55), Kohat tunnel and Access Roads
Indus highway Project (N-55), Kohat tunnel and Access Roads
Location |
Khyber Pakhtunkhwa State, Islamic Republic of Pakistan |
Client |
National Highway Authority (NHA) |
Design |
Pacific Consultants Co., Ltd. |
Completion |
2003 |
Overview |
Tunnel for highway in Himalaya region. Tunnel Work (1,885m): Excavation 166,000m3, Concrete 24,000m3. Road Work (28.17km): Earth Work 4,480,450m3,Surfacing 15,121m3 |
Facility type |
Tunnels/Roads |
Gates of Taunsa Barrage
Gates of Taunsa Barrage
Location |
Punjab State, Islamic Republic of Pakistan |
Client |
Punjab State Iirrigation Electricity Bureau |
Design |
Sanyu Consultants Inc. /Yachiyo Engineering Co., Ltd. Joint Venture |
Completion |
2009 |
Overview |
Project for the Rehabilitation of Gates of Taunsa Barrage. Renovation of the weir gate facility and construction of bulkhead gate stockyard. |
Facility type |
Seafront, ports, rivers |
Improvement of National highway No.25
Improvement of National highway No.25
Location |
Baluchistan State, Islamic Republic of Pakistan |
Client |
National Highway Authority |
Design |
INGÉROSEC Corporation/Nippon Koei Co., Ltd. Joint Venture |
Completion |
2010 |
Overview |
Road improvement work with a total length of 96 KM between Carraro and Wad on Route 25 connecting Karachi to Afghanistan via Quetta. |
Facility type |
Roads/Tunnels |
Water supply and drainage, rainwater storage, spillways
Kanpur Water Treatment Plant (Contract I-4)
Kanpur Water Treatment Plant (Contract I-4)
Location |
Punjab State, Islamic Republic of Pakistan |
Client |
Capital Development Authoriry, Government of Pakistan |
Design |
NJS Consultants Co. Ltd. |
Completion |
1999 |
Overview |
Water Treatment Plant : 273,000m3/day |
Facility type |
Water supply and drainage, rainwater storage, spillways |
Symly Metropolitan Water Supply Project (Package I&II)
Symly Metropolitan Water Supply Project (Package I&II)
Location |
Islamabad, Islamic Republic of Pakistan |
Client |
Capital Development Authority, Islamic Republic of Pakistan |
Design |
Nippon Koei Co., Ltd. |
Completion |
1995 |
Overview |
Water treatment plant of which capacity is 82,000m3/day. |
Facility type |
Water supply and drainage, rainwater storage, spillways |
Weather Forecasting Center in Islamabad
Weather Forecasting Center in Islamabad
Location |
Islamabad, Islamic Republic of Pakistan |
Client |
Pakistan Meteorological Department, Cabinet Secretariat (Aviation Division), The Islamic Republic of Pakistan |
Design |
International Metrological Consultant Inc. /Japan Weather Association/CTI Engineering International Co., Ltd. |
Completion |
2018 |
Total Floor Area |
562.76m2 |
Floors |
15F |
Facility type |
Others |